HARRYBILT ENGINEERING Hi Rail Dumper

Product Overview

Harrybilt Engineering has developed a Triple Gauge and Dual Gauge Rail System designed specifically for the Wacker Neuson DV90 base machine.

The Friction Drive System converts wheeled dumpers for rail applications, enabling seamless operation on both road and rail networks.

Retractable rail wheel assemblies installed on the dumper positioning the vehicle on the rail, allowing the rear tyres continue to provide traction and braking, whilst providing train stop clearance. The rear end has a mechanical twist mechanism to suit the rail regulator’s requirements. All four rail wheels are fitted with park brakes to prevent “runaways”, as well as service brakes to make the unit more agile & productive.

All controls will be operated from the driver’s cabin. All hydraulic components are matched to the dumper’s specifications for flow rate, operating pressure and temperature.

  • Max. 25km/h Speed on Rail
  • Tipper Bin Upgraded to 8t+ Rail Ballast Payload

 

Key Features

Seamless Road-to-Rail Operation

The Friction Drive System converts the Wacker Neuson DV90 into a versatile Hi Rail Dumper, enabling efficient operation across both road and rail networks.

Safe & Compliant Rail Performance

Features retractable rail wheel assemblies, triple and dual gauge compatibility, integrated park and service brakes, and a mechanical twist mechanism to meet rail industry requirements.

Operator-Focused Design 

All functions are controlled directly from the driver’s cabin, with hydraulics matched to the dumper’s specifications for smooth, reliable, and productive operation.

Specifications

Hi Rail Dumper
Attachment Weight (KG)
Oil flow (LPM)
Oil Pressure (PSI)
Excavator Class (Tons)

Industry

Type

HIRAIL

Machine

Stand alone machine

Interested in the Product?

Get the right attachment for the job — faster, tougher, and built for NZ conditions.
Let’s enquire about how Boss can deliver results for you.

Related Products

HARRYBILT ENGINEERING Hirail Trucks

The Rail wheels can be set to either Narrow, Standard or Broad Gauge and are propelled by hydraulic motors installed within the rail system. Excavators are rigorously commissioned and tested so every Hi Rail Machine is Rail Ready when it leaves the workshop.

HARRYBILT ENGINEERING Hirail Track Excavators

Harrybilt Engineering offers a turnkey solution for all Track Excavators, this includes the supply of the excavator, the installation of the Hi Rail System and supporting registration for required networks around Australia so the machine is Rail Ready when it leaves the workshop. The team can also handle the purchase and installation of a Tiltrotator along with Harrybilt Engineering’s own wide range of Rail Maintenance Attachments.

HARRYBILT ENGINEERING Hi Ride System

Harrybilt Engineering have developed the Hi Ride Rail Guidance System as a Standard Gauge set-up, which uses a Friction Drive mode to travel over train stops and some train platforms.

The RGS Hi Ride is AS7502 compliant, braking with integrated disk service brakes and fail-safe tread brakes on the rail wheels. The system is Rail Guidance (direct drive) for superior stability, pulling and stopping performance with a revised load chart and a compliant twist mechanism for each configuration.

Explore More Boss Attachments

Discover our full range of premium earthmoving and demolition attachments.

keyboard_arrow_up
Secret Link